Cash Flow Management for Project-Based Businesses

By Newtown Analytics · · 9 min read

For smb owners & operators

Cash flow management for project-based businesses is about the shape of each job's cash curve. Costs usually start on day one, billing follows progress and often lags it, customers hold back part of every payment, and the final and most profitable dollars arrive last. Construction firms, agencies, engineering practices, event producers and installers all share this pattern. Run several projects at once and the early-stage cash troughs stack on top of each other, which is how a company with a full order book ends up short of cash. This guide shows how to model a project's cash curve with a worked example, how retainage and billing structure change it and how to manage the portfolio. It builds on cash flow management and the forecasting method in the 13-week cash flow forecast.

Why project cash is different

FeatureCash effect
Costs front-loadedMobilization, materials, deposits to subcontractors and payroll come before the first invoice
Billing in arrearsProgress is invoiced monthly or at milestones, after the cost has been paid
Approval delaysClient sign-off on pay applications or milestones adds days or weeks
RetainageA percentage (often around 5 to 10 percent in construction contracts, set by the contract) is withheld until completion
Subcontractor termsPayment to subs may be due before or after you are paid; pay-when-paid clauses vary by contract and jurisdiction
Change ordersExtra work performed but not yet approved is unpaid cost
Final paymentCloseout, punch lists and warranty periods delay the last receipts
Overlapping projectsSeveral projects in their cash-negative phase at once multiply the funding need

A worked example: one project's cash curve

A hypothetical project has a contract value of $1,000,000 and a budgeted cost of $800,000, so the planned profit is $200,000 (20 percent of the contract). The project runs six months. Amounts below are in thousands of dollars.

Assumptions:

  • Costs by month: 100, 150, 180, 180, 120, 70 (total 800).
  • 60 percent of each month's cost is paid in that month (labor and materials). The other 40 percent (subcontractors) is paid a month later.
  • Billing each month equals cost incurred × 1.25 (the contract-to-cost ratio), invoiced at month end.
  • The client withholds 10 percent retainage and pays the rest 30 days after invoice.
  • The retainage ($100,000) is released in month 8, 60 days after completion.
MonthBilledReceipts (net of retainage, one month later)PaymentsNet cashCumulative
1125.0060.0-60.0-60.0
2187.5112.5130.0-17.5-77.5
3225.0168.75168.00.75-76.75
4225.0202.5180.022.5-54.25
5150.0202.5144.058.54.25
687.5135.090.045.049.25
7078.7528.050.75100.0
80100.0 (retainage)0100.0200.0

The payments column follows from the rule: month 2, for example, is 60% × 150 + 40% × 100 = 130.

What the curve shows:

  • Peak funding need: $77,500 in month 2, about 7.8 percent of the contract value.
  • Breakeven: cumulative cash turns positive only in month 5.
  • Retainage: $100,000 is held until month 8, equal to half of the project's total profit.
  • Final cash: $200,000, which matches the planned profit, but it arrives eight months after the first cost.

Without retainage and with full payment 30 days after each invoice, the peak funding need would be about $65,000 instead of $77,500, and the cash would come back earlier. That $12,500 difference, plus the delay of $100,000, is the cost of the retention clause. When a contract allows it, negotiating a lower retainage rate, early release at substantial completion or payment of retainage in stages can be worth real money.

Portfolio view: troughs stack

A company running five projects like this one, staggered by two months, would need about the same peak per project, but the troughs overlap. Adding a new project at the moment when other projects are in their cash-negative months can push the total need well above the average.

How to model it

  1. Build a cash curve for each project from its schedule of costs and billings.
  2. Offset each curve by its start date.
  3. Add the curves to get the portfolio forecast by week or month.
  4. Find the lowest cumulative point and compare it with available cash and credit.
  5. Test start dates: delaying one project by a month may remove the pinch.

A pipeline view, with a probability on each prospective project, lets you decide which bids to pursue and when to say no to a job that would arrive at the wrong time.

Over- and underbilling

Compare billing with progress to see whether a project is ahead or behind on cash.

Worked example

A project has a $1,000,000 contract and is 50 percent complete, so earned revenue is $500,000.

  • Billed to date $600,000: overbilled by $100,000. You are holding client cash for work not yet done. That is useful, but it is also a liability that you will spend if you are not careful.
  • Billed to date $400,000: underbilled by $100,000. You have done work you have not yet invoiced. It is cash you have already spent and should be billed as soon as the contract allows.

Review the over- and underbilling schedule monthly by project. Persistent underbilling points to slow invoicing, disputed progress or weak documentation. Persistent overbilling on front-loaded schedules can hide a project that is losing money, because early billings mask rising costs to complete.

Change orders and claims

Extra work done before a change order is approved is unfunded cost. Practices that protect cash:

  • Get written approval, or at least written direction, before starting extra work.
  • Record the cost of the change as it is incurred.
  • Submit pricing quickly, with supporting detail.
  • Track pending change orders separately in the forecast, with a low probability until approved.
  • Do not count disputed claims as cash.

Billing design

DesignCash effect
Deposit or mobilization paymentFunds early costs; can shrink the early trough
Front-loaded schedule of valuesBrings cash earlier; check the contract and be ready to justify it
Milestone billingTies cash to deliverables; keep the milestones small and measurable
Progress billing monthlyStandard; shorten the cycle to biweekly if the client agrees
Stored material billingAllows billing for materials delivered but not installed, where the contract permits
Release of retainage at substantial completionPulls cash forward
Late payment interest or feesAn incentive to pay, if enforceable

Check what is allowed by contract and local law, and take advice on lien rights and payment rules in your jurisdiction.

Subcontractor and supplier terms

Match your payment terms to your receipt terms where you can. If you are paid net 45 after approval, offering subcontractors net 30 creates a funding gap of 15 days or more. Pay-when-paid or pay-if-paid clauses can reduce the gap, but their enforceability varies, and they can strain relationships. Get legal advice before relying on them. See how to negotiate better supplier payment terms.

Bonding, guarantees and deposits

Bonds and bank guarantees consume credit capacity and may require collateral. Include premiums, fees and cash collateral in the forecast. When bidding, consider the effect of performance bond requirements on your borrowing room.

Forecasting cash for projects

LineDriver
Billings and receiptsProject schedule, pay application dates, approval lag, retainage
PayrollStaffing plan by project
Subcontractors and suppliersPurchase schedules and terms
Equipment and mobilizationProject start dates
OverheadOffice, insurance, bonding, software
Taxes, debt serviceSchedule

Use the actual payment lag by client rather than the contract terms. Build a 13-week view from approved pay applications and a 12-month view from the project schedule. See how to build a cash flow forecast you will actually use and cash flow scenario planning. Typical scenarios are a project delayed by two months, a client that withholds a disputed amount and a cost overrun on a major job.

Financing options

NeedPossible tool
Smoothing early troughsRevolving line of credit. See revolving line of credit vs. term loan
Cash on approved receivablesInvoice financing. See invoice factoring vs. invoice financing
Materials purchaseSupplier credit or inventory financing. See inventory financing
Large projectsProject-specific financing or asset-based lending. See asset-based lending
Emergency gapsCompare carefully before using costly advances. See merchant cash advances

Lenders will look at your backlog, work-in-process schedule, aging and job-level margins. See how lenders evaluate your cash flow and working capital.

Project cash dashboard

Track weekly or monthly:

  • Cash balance and the 13-week low point
  • Cash position by project, cumulative to date
  • Over- and underbilling by project
  • Retainage held, by project and expected release date
  • Receivables aging by client, and pending approvals
  • Pending change orders and unbilled extras
  • Backlog, with expected start dates
  • Forecast accuracy. See how to measure and improve cash forecast accuracy

Common mistakes

  • Starting several large projects in the same quarter without a portfolio cash check.
  • Ignoring retainage in the forecast.
  • Doing extra work before the change order is approved.
  • Invoicing late or in large monthly batches.
  • Paying subcontractors faster than you are paid.
  • Treating pending claims as cash.
  • Using the contract's terms rather than the client's payment history.
  • Bidding aggressively without pricing the funding cost.

Where planning fits

For companies that make or install physical products as part of projects, procurement timing and inventory decisions drive the early cash trough. Forecasting material needs from the project schedule reduces both stockouts and idle stock. See demand planning and inventory optimization.

For ecommerce, where cash cycles are shorter, see cash flow management for ecommerce brands. For consumer products, where retailers set terms, see cash flow management for CPG and consumer product companies. For professional services billed by time, see cash flow management for consulting and professional services firms.

FAQs

Why do project-based businesses have cash flow problems?

Costs are paid before billings are collected, retainage delays final payments and overlapping projects stack their early funding needs.

What is retainage and how does it affect cash flow?

Retainage is a portion of each payment withheld by the client until completion or a later date. It delays cash that is often a large share of the project's profit.

How do I forecast cash for multiple projects?

Build a cash curve for each project, offset each by its start date and add them together to find the portfolio low point.

What is the difference between overbilling and underbilling?

Overbilling means you have billed more than the work completed, holding client cash early. Underbilling means you have done work you have not yet billed.

How can I reduce the funding need on a project?

Negotiate deposits, shorter billing cycles, lower or staged retainage and payment terms that match what you pay subcontractors.

This article is for general information. It is not accounting, tax, legal or investment advice, and examples use illustrative numbers rather than client data. Confirm decisions that carry financial or legal consequences with a qualified professional.